The last two storeys left

A concrete construction of the “B building” of Francuska Office Center is expected to be finished in a few weeks. The two last storeys are currently under way. Below photos show a preparation of the sixth storey. The “A building” is waiting for the continued works – walls, pipe and ventilation fittings. A little slowdown of construction is connected with longer negotiations with tenants which delay their renting decisions.