Tuesday, February 7, 2012

Posts Tagged ‘square’

First pillars of Railway Station grow

First pillars of Railway Station grow

Wednesday, January 11, 2012 20:19

One month ago, Neinver showed us a prototype of pillars and underground interiors of Galeria Katowicka. Meantime, works have began on the new cap-shaped “umbrellas” of the Railway Station. Construction crews already prepared four bottom structures of the pillars. The former original sixteen cup-shaped pillars of the main ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Szewczyka Square after 365 days of works

Szewczyka Square after 365 days of works

Friday, December 9, 2011 19:37

One year has passed since a construction work on the integrated transportation, retail and business center at Szewczyka Sq. had commenced. Nowadays, the works are entering a next stage – the construction operation are being carried out on the ground level of Galeria Katowicka. Although some of the works ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Closing of Szewczyka Sq.

Closing of Szewczyka Sq.

Wednesday, January 12, 2011 22:56

Today, on 12th of January 2011, a next stage of the Katowice Railway Station’s redevelopment has commenced. After demolition works on the Station’s cup-shaped pillars, a following step is to knock down the ground floor and foundations, and finally to sort and remove the building’s remains. On 24th ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Goldstein Palace restored

Goldstein Palace restored

Sunday, December 19, 2010 22:14

On 10th of December, the Civil Registry Office was officially opened in the newly restored Goldstein Palace located at 12A Wolności Square. The Office was moved from Korfantego Avenue. The previous seat is planned to be demolished and the plot will be sold to a private investor within the framework ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Second stage of preparatory works

Second stage of preparatory works

Wednesday, December 15, 2010 14:27

On Thursday, 16th of December, preparatory works at Szewczyka Sq. will enter the second stage. After ten days of works a part of the overpass at the Square was already demolished. Tomorrow, the fencing will be moved to enable a demolishment of the second part of the overpass as ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Demolishment works begin

Demolishment works begin

Wednesday, December 8, 2010 14:26

Today, a demolishment of the overpass at Szewczyka Sq. was started. It is the first stage of works coming before the development of new Railway Station and Galeria Katowicka. Vehicles traffic is still possible along the main Railway building on Dworcowa St. in both directions. „The new ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Szewczyka Sq. deserted, preparatory works start

Szewczyka Sq. deserted, preparatory works start

Monday, December 6, 2010 14:57

On Saturday, 4th of December, public transportation was eliminated from Szewczyka Sq. and the bus stops were moved to other locations in the City Center including Market, Wolności and Andrzeja Squares. Today, workers started fencing part of Szewczyka Sq. and are preparing to demolish the overpass. First construction ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Neinver starts works at Szewczyka Square

Neinver starts works at Szewczyka Square

Thursday, December 2, 2010 0:04

Monday, 6th of December, 2010 will see the beginning of the main stage of Katowice Railway Station reconstruction. The first phase will involve taking to pieces an overpass located above the Square and the Station hall. The construction area will be fenced in a gradual manner. Works schedule ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Neinver chose Strabag as prime contractor

Neinver chose Strabag as prime contractor

Wednesday, December 1, 2010 14:11

On November 25th 2010, Strabag Sp. z o.o. and Galeria Katowicka Sp. z o.o. (company associated with Neinver Polska) signed a contract for the construction of a multifunctional integrated transport and commercial center on the Katowice’s main Railway Station, with the construction of the new Railway Station. The construction works ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments
Closing of Railway Station

Closing of Railway Station

Thursday, October 21, 2010 17:30

Neinver and PKP S.A. launch the final stage of preparatory works connected with the redevelopment of the Railway Station and Szewczyka Sq. Since next Monday, 25th of October, the Station’s building will be closed for passengers. There will be only a temporary passage-way in the main hall connecting Szewczyka ...

This was posted under category: Railway Station  |  Read Full Story  |  0 Comments