Tuesday, May 22, 2012

Posts Tagged ‘mostostal warszawa’

Final concrete works

Final concrete works

Wednesday, August 31, 2011 17:17

Mostostal Warszawa, a prime contractor of the Silesian Philharmonic’s extension, strongly advanced a construction work on the building last weeks. A raw structure of the new five-storey part was topped-out lately and works are carrying out in the interiors. Now, final construction works on a concrete structure ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
New scales of Spodek

New scales of Spodek

Wednesday, August 3, 2011 14:09

Mostostal Warszawa S.A. is concluding an assembling work on the new elevation made of aluminium scales of the “Spodek” sport and entertainment hall. Workers are currently removing a scaffolding and first parts of the new scales were uncovered today. The works on the new elevation is part of the ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
SICAL commissioned

SICAL commissioned

Thursday, July 7, 2011 22:22

On 7th of July 2011, the building of the Scientific Information Center and Academic Library (SICAL) was commissioned. The process ensures that the building was built according to the contract documents, the design intent and the owner's operational needs. A construction work on the joint project of the ...

This was posted under category: University Library (SICAL)  |  Read Full Story  |  0 Comments
New organs for Silesian Philharmonic

New organs for Silesian Philharmonic

Sunday, June 26, 2011 22:20

Soon, music lovers will have a great opportunity to enjoy new organs of the Silesian Philharmonic. The organs will be provided by renowned Karl Schuke Berliner Orgelbauwerkstaat from Germany. The company also built organs for the Berlin Philharmonic, Warsaw Philharmonic and Academy of Music in Kraków. “Every organs have ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Philharmonic uncovers brick interiors

Philharmonic uncovers brick interiors

Monday, April 18, 2011 14:44

Mostostal Warszawa S.A. is carrying out a redevelopment of the building of Silesian Philharmonic. The construction crew is mostly involved in a dismantling of walls and ceiling facing at present. The extension shall be increased by 2 066 sq. meters to reach the total surface of 5 252 sq. ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Renewal of Spodek elevation starts

Renewal of Spodek elevation starts

Monday, March 28, 2011 14:41

Mostostal Warszawa S.A., a prime contractor of the refurbishment of “Spodek’s” elevation, started preparatory works for assembling a new building’s facade. A fair-sized scaffolding is just coating the hall. The facade of “Spodek” covers approximately 3 500 sq. meters and is made of 30 thousand concrete scales. Another 10 ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Hard work on Silesian Philharmonic

Hard work on Silesian Philharmonic

Friday, March 18, 2011 13:12

After several weeks of slowdown of the Silesian Philharmonic’s redevelopment due to unplanned additional works on load-bearing walls which had to be reinforced, construction works are to back on its previously scheduled track now. A construction crew is currently involved in a dismantling of walls and ceiling facing. To strengthen ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Mostostal Warszawa will revamp Dom Prasy

Mostostal Warszawa will revamp Dom Prasy

Monday, March 14, 2011 15:41

Mostostal Warszawa will modernize former cult seat of the regional journals – Press House (“Dom Prasy”). The company signed the contract with the City Hall (the investor) on 8th of March 2011. The new building, located at 1 Młyńska Street at the Market Square, will reveal its ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Spodek waits for new scales

Spodek waits for new scales

Wednesday, February 16, 2011 23:40

Spodek”, a sport and exhibition hall, and one of the icons of Katowice will get a new elevation. It is a next stage of refurbishment commenced in 2009. Today, sample elements of the elevation were shown public. A decision, which colour of four presented is going to be ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments
Mostostal struggles with Silesian Philharmonic

Mostostal struggles with Silesian Philharmonic

Thursday, February 3, 2011 23:33

In September 2010, construction works on the extension of the Silesian Philharmonic were started by Mostostal Warszawa, the prime contractor of the investment. Lately, the builder’s crews were improving foundations of the existing building using a jet grouting technique. It is a process of producing a soil-cement material thanks ...

This was posted under category: Other buildings  |  Read Full Story  |  0 Comments