
Mostostal Warszawa, a prime contractor of the Silesian Philharmonic’s extension, strongly advanced a construction work on the building last weeks. A raw structure of the new five-storey part was topped-out lately and works are carrying out in the interiors. Now, final construction works on a concrete structure ...

Mostostal Warszawa S.A. is concluding an assembling work on the new elevation made of aluminium scales of the “Spodek” sport and entertainment hall. Workers are currently removing a scaffolding and first parts of the new scales were uncovered today. The works on the new elevation is part of the ...

On 7th of July 2011, the building of the Scientific Information Center and Academic Library (SICAL) was commissioned. The process ensures that the building was built according to the contract documents, the design intent and the owner's operational needs. A construction work on the joint project of the ...

Soon, music lovers will have a great opportunity to enjoy new organs of the Silesian Philharmonic. The organs will be provided by renowned Karl Schuke Berliner Orgelbauwerkstaat from Germany. The company also built organs for the Berlin Philharmonic, Warsaw Philharmonic and Academy of Music in Kraków. “Every organs have ...

Mostostal Warszawa S.A. is carrying out a redevelopment of the building of Silesian Philharmonic. The construction crew is mostly involved in a dismantling of walls and ceiling facing at present. The extension shall be increased by 2 066 sq. meters to reach the total surface of 5 252 sq. ...

Mostostal Warszawa S.A., a prime contractor of the refurbishment of “Spodek’s” elevation, started preparatory works for assembling a new building’s facade. A fair-sized scaffolding is just coating the hall. The facade of “Spodek” covers approximately 3 500 sq. meters and is made of 30 thousand concrete scales. Another 10 ...

After several weeks of slowdown of the Silesian Philharmonic’s redevelopment due to unplanned additional works on load-bearing walls which had to be reinforced, construction works are to back on its previously scheduled track now. A construction crew is currently involved in a dismantling of walls and ceiling facing. To strengthen ...

Mostostal Warszawa will modernize former cult seat of the regional journals – Press House (“Dom Prasy”). The company signed the contract with the City Hall (the investor) on 8th of March 2011. The new building, located at 1 Młyńska Street at the Market Square, will reveal its ...

“Spodek”, a sport and exhibition hall, and one of the icons of Katowice will get a new elevation. It is a next stage of refurbishment commenced in 2009. Today, sample elements of the elevation were shown public. A decision, which colour of four presented is going to be ...

In September 2010, construction works on the extension of the Silesian Philharmonic were started by Mostostal Warszawa, the prime contractor of the investment. Lately, the builder’s crews were improving foundations of the existing building using a jet grouting technique. It is a process of producing a soil-cement material thanks ...