Wednesday, February 8, 2012

Last floor underway

Friday, May 14, 2010, 23:36
This news item was posted in University Library (SICAL) category and has 0 Comments so far.

Construction works of a lower main part of the Scientific Information Center and Academic Library (SICAL) were finished in April. Currently, builders are progressing with a three-storey top block and partition walls in the lower part. The last third floor of the small block is already underway and a topping out of the six-storey construction can be expected very soon. The small 14 meters high block will be closed for readers and is designed for store rooms of unique and guard files.

The set of photos presented below comes from the project’s website, ciniba.us.edu.pl. To see all the photos, go to the gallery >>>

© University of Silesia, SICAL

You can skip to the end and leave a response. Pinging is currently not allowed.

Leave a Reply